Yesh Pal Singh

Bis 2015, Piping Engineer, ATKINS Global, DENMARK

Esbjerg, Dänemark

Fähigkeiten und Kenntnisse

PDMS
Piping Design
Piping Stress Analysis
Pressure Vessel Design calculation
PVElite
OhmTech
ROHR2
Triflex
Refinery Layout Design
Petrochemical Plant Layout Design
Brewery Plant Layout Design
Feed and Bio Fuel Plant Layout Design
AutoCAD
Autodesk Inventor
Autocad Plant 3D
Intergraph PDS
MicroStation
Mathcad
COMOS
AutoCAD P&ID
Oil and gas offshore piping design
Offshore
CAESAR II
AutoPLANT
OpenPLANT
OptiPlant
ASD Products
Industrial design
Factory Design
CADWorx
Engineering

Werdegang

Berufserfahrung von Yesh Pal Singh

  • 7 Jahre und 4 Monate, Feb. 2015 - Mai 2022

    Mechancal Piping Engineer

    STENSBO ApS Denmark

    Piping Design, Piping Engineer, Piping Designer, Layout Designer, SmartPlant 3D, OptiPlant, PDS, CadPIPE, AutoPlant, Autocad, Microstation, Piping Material Engineer, ANSI, ASME, Euro Codes, Pipe Stress Engineering, Caesar II, ROHR2, AutoPipe, TRIFLEX, Mechanical, Project Management, Ohmtech, PVElite, Mathcad, FEA Autodesk Inventor, Pipe Stress Analysis, EN 13480, ASME B31.3, AutoCAD Plant 3D, Inventor, Solidworks, Pressure vessel design, EN13445, ASME Section-8.

  • 1 Jahr und 8 Monate, Juni 2013 - Jan. 2015

    Piping Engineer

    ATKINS Global, DENMARK

    Defining Scope of work, preparing Engineering work package. Site/field survey onshore and offshore in North Sea Danish Sector for client MAERSK Oil and Gas, and DONG Energy. Checking 3D models in a multi-discipline CAD environment. Used AutoPLANT and Naviswork. Developing and checking 3D models in a multi-discipline CAD environment. Dealing with Point Cloud 3D scanned image and Navisworks. Triflex Caesar II

  • 4 Jahre und 7 Monate, Juli 2010 - Jan. 2015

    Director Engineering Services

    Danish Engineering And Technical Services Company

    https://www.linkedin.com/company/danish-engineering-and-technical-services-company/

  • 2 Jahre und 8 Monate, Okt. 2010 - Mai 2013

    Project/Plant Design Engineer

    ANDRITZ Feed and Bio fuel, DENMARK

    Defining Scope of work, preparing Engineering work package. Preparing RFQ, Request for quotation communication with suppliers/vendors. For Silo, Bins, Elevators. Preparing technical specification and data sheets for ANDRITZ machines Pellet Mill, Hammer Mill, Conditioner, Screws, conveyors. For machine fabrication based on the project requirements. Technical calculation and cost estimate.

  • 2 Jahre und 2 Monate, Sep. 2008 - Okt. 2010

    Piping Engineer

    ATKINS Global, DENMARK

    Piping Layout design, Fabrication Iso, BOQ. Working on TRIFLEX, Piping Stress Analysis Tool. Activities/Task working on: Pipe thickness calculation. Critical Line list preparation & System Definition.

  • 5 Monate, Mai 2008 - Sep. 2008

    Piping Plant Design Engineer

    PENTAIR, Netherland

    Brewery Industry: Co2 Recovery Plants. Manufacturing of Pressure vessels, Foam Separator, Gas Washer, CO2 Compressors

  • 6 Monate, Dez. 2007 - Mai 2008

    Engineering Manager

    ASD Global, San Francisco, California, USA

    Leading group of engineers, to prepare 3D model for cost estimation/quantity for Preliminary and Front End Engineering(FEED) and for Detail engineering, on OptiPlant Software, Exploring more business and clients worldwide, coordinating day to day engineering activities among ASD and clients, Providing technical support to ASD's engineering team.

  • 6 Monate, Juli 2007 - Dez. 2007

    Senior Piping Desiger

    Jacobs Engineering Group, Inc. LongBeach, Los Angeles, California, USA

    JACOBS Engineers INC. BP Project:02U20670 British Petroleum Carson Refinery, 2350 E. 223rd St., Carson, Los Angeles CA 90810 Worked for Carson Refinery, Sulphar Plant Modification Project

  • 6 Monate, Feb. 2007 - Juli 2007

    Senior Piping Designer

    ANVIL Corporation, Bellingham, Washington, USA

    ANVIL Corporation BP Project:BE9159 British Petroleum Cherry Point Refinery, Whatcom County Blaine, Bellingham, Washington State Worked for East Refinery Utility Infrastructure Project

  • 8 Monate, Juni 2006 - Jan. 2007

    Piping Engineer

    ENI, (Former USSR Region Russia)

    Front end engineering design study and conceptualizing project, Material take off Material purchase order, project detail design, follow up/Coordinating Engineering construction work in Burun, Balkan oil field in Former USSR region, Providing technical support in construction phase, Reviewing drawings plans to ensure engineering designs are in compliance with appropriate industry codes and standards. Preparing and evaluating tenders for engineering and construction services.

  • 9 Jahre und 1 Monat, Mai 1997 - Mai 2006

    Piping Designer

    UNION Carbide Corporation, Houston, Texas, USA

    1997-Trained in Team Concept:- Team Management, Team Player, 1998-RCA (root cause analysis) 2000-Working with Management tools such as MOC (management of change) 2001-Empowerment and Lean organization, Six Sigma, 2001-BBP (behavior based policy) 2001-AICR (action, incident, condition report). Projects Worked with- FLUOR DANIEL- Utility Plant BROWN & ROOT- Ethylene Plant TOYO- Poly Propylene Plant FOASTER WHEELER ITALIANA- Ethylene Glycol Plant SNAMPROGETTI- Poly Ethylene Plant

  • 3 Jahre und 8 Monate, Juli 1993 - Feb. 1997

    Mechanical HVAC Designer

    BMB Engineering Group, KUWAIT

    HVAC Design

  • 1 Jahr und 10 Monate, Sep. 1990 - Juni 1992

    Trainee Engineer

    HYUNDAI Engineering and Construction Co. KOREA

    Have been Working/Learning, designing HVAC System, Heat Load Calculation Air Distribution, Duct Sizing Bill of Quantity,

Ausbildung von Yesh Pal Singh

  • 4 Jahre, Juli 1986 - Juni 1990

    Mechanical Engineering

    Jamia Millia Islamia

    Mechanical Engineering Design

Sprachen

  • Englisch

    Fließend

21 Mio. XING Mitglieder, von A bis Z